Health Resort, Bad Brambach
Project Description
Therapy building with indoor and outdoor pool and a wellness area. Fountain house of the “Wettinspring”.
Slab system without downstand beams, shallow foundation with a waterproof concrete tanking situated in a healing water protection zone. 25 meter indoor pool separated by lock gates from the outdoor thermal bath. The thermal bath consists of a jointless construction with punctual elastomer supports. The roof of the pool hall consists of a 22 cm thick concrete structure with thermally separated cantilevers at the façade. The cantilevers are supported by slender steal composite columns.
Client
Sächsische Staatsbäder
Architect
Auer + Weber, Stuttgart
Gross Area / Volume
5.150 m² / 20.300 m³
Planning-/Construction-Period
1997 - 2001
Awards
German Galvanization Prize 2001, 2. prize