Topping-Out of new Residential Building

The topping-out ceremony took place for the new construction of a residential complex of the Beamtenwohnungsverein in Schwabing/Munich on 13.07.2017.
The building with basement / underground car park, ground floor, 4 further upper floors and a staggered storey is predominantly constructed in solid construction: the ceilings and cores of reinforced concrete and the outer walls of masonry filled with mineral wool. The staggered storey is constructed in timber construction to reduce weight. The clearance height is between 2.50 and 2.60 meters. Because of the groundwater situation, the floor slab and the lower part of the rising walls are designed as a waterproof concrete structure.

 

«  back